Burdur Karacaören Baraj Havzası Atıksu Toplama ve Arıtma Tesisleri Proje Yapım İşi




Project Location: Isparta and Burdur, Turkey

Client: State Hydraulic Works (DSİ)

Financed By: Republic of Turkey

Dates: January 2017 – May 2019

Scope: Feasibility Study, Detailed Design Waste Water Treatment Plants of Isparta Municipality and Ağlasun (Burdur) Municipality and sewage collector lines and Preparation of Tender Documents,

Figures:

Isparta WWTP, 120 000 m³/day, EP 555 710 cap.

Ağlasun WWTP, 2 150 m³/day, EP 15 250 cap.

Sewer Collector: 300 mm – 1 600mm, Concrete and Corrugated HDPE Pipe, L=3 296 m