TR | EN | RU
Özel Yapım Reklam Ajansı

Надзор за строительными работами Проекта водоснабжения в городе Милас




Project Location: Milas-Muğla, Turkey

Client: State Hydraulic Works (DSİ)

Financed By: Republic of Turkey

Dates: November 2017 - Ongoing

Scope: Construction Supervision

Figures:

Water Transmission Main:  550 mm – 200 mm, L=19 600 m

Water Storage: Total Capacity = 3 000 m3, 2 units

Water Treatment Plant: 21 000 m3/day


 

Back to Projects