Inauguration of the First Phase of the Faisalabad Water Resources Extension Project (Phase II)
On October 15, 2025, the inauguration ceremony of the completed structures of the first phase of the “Extension of Water…
Technical Assistance
Corporate Empowerment
Construction Inspection
Commissioning
Tender Preparation
On October 15, 2025, the inauguration ceremony of the completed structures of the first phase of the “Extension of Water…
Between October 6 and 8, 2025, our company representatives, Mr. Burak Tuncer and Ms. B. Alev Dumlupınar, attended the “Central…
Between October 4 and 10, 2025, project progress meetings were held at our Tashkent, Uzbekistan office with the participation
On September 10, 2025, our Company Director Mr. Tamer Tuncer and Company Representative Ms. Alev Dumlupınar visited the
On July 25, 2025, the Ministry of Economy and Finance of the Republic of Uzbekistan signed five new contracts under…
On June 6, 2025, Konya Metropolitan Municipality Mayor Uğur İbrahim Altay inspected the main collector line construction works between Sancak…
The evaluation meeting for the Wadi El Manejeen Sewerage Collector Line – Pumping Station – Odor Treatment Plant and Sea…
ART was awarded the Engineering, Design and Construction Supervision Consultancy contracts for ‘Central and Southern Settlements – III’ and ‘Central…
In Suluova, 22 May 2025 ‘Suluova Wastewater and Stormwater Project Promotion Event’, for which we are the consultant of Art…
‘Training on GIS Applications in Wastewater Treatment Plants’ within the scope of ‘Suluova Wastewater and Stormwater Project Technical Assistance Component’,
The site visit of ‘Faisalabad 25 MGD Drinking Water Treatment Plant Construction’ within the scope of ‘Improvement of Water Resources…
A meeting was held on 7 May 2025 at the meeting hall of Faisalabad Water and Sewerage Authority with the…