Project and Contract Management

Extension of Water Resources for Faisalabad City Phase 2 Consultancy Services for Preparation of Preliminary Designs, Tender Documents, Safeguards (ESIA and RAP) Reports and Construction Supervision, AFD Funded (WASA Faisalabad)
Date: February 2022-Ongoing
Location: Pakistan
Work Detail: To improve the living conditions of Faisalabad residents by improving the drinking water service, expanding the service and improving the quality of water service (continuity and pressure), protecting the water supply and strengthening the viability of the financial position of WASA-F, increasing the drinking water production capacity by 135,000 m3/day by preparing preliminary projects, revising the investment budget and preparing tender documents and providing technical support to the contracting authority in the tender. – Expansion of the existing Jhal WWTP capacity by 15 MGD with the addition of 5 MGD; – Construction of a new 25 MGD WTP and raw and reclaimed water transmission lines. – Preparation of Non-Revenue Water reduction programme, establishment of zones (District Metering Zones and District Metering Areas) through piloting of SCADA system, leak detection and 24/7 service concept. -Preparation of preliminary projects, – Revision of investment costs, – Preparation of tender documents, – Providing technical assistance to the Contracting Authority

Technical Assistance and Supervision for Elbistan Wastewater Project (Ministry of Environment, Urbanization and Climate Change)
Date: November 2019-Ongoing
Location: Turkey
Work Detail: Consultancy services and technical support for the Elbistan wastewater treatment plant with a capacity of Q = 22,500 m3/day under the management of the European Union – Ministry of Environment and Urbanization, implementation of the loss-leak program, construction supervision (L = 33 km) wastewater collectors.

Technical Assistance and Supervision for Şırnak Wastewater Treatment Plant Project (Ministry of Environment, Urbanization and Climate Change)
Date: November 2019-Ongoing
Location: Turkey
Work Detail: Consultancy services and technical support for the Şırnak wastewater treatment plant with a capacity of Q = 10,000 m3/day, implementation of the loss-leakage program and collector line (L = 1.6 km) construction supervision, under the management of the European Union – Ministry of Environment and Urbanization.

Construction Supervision Works for Milas Water Supply Project
(State Hydraulic Works (DSİ)

Date: November 2017-Ongoing
Location: Turkey
Work Detail: Construction supervision of infrastructure system of Milas province including water intake structures, water transmission lines, water reservoirs and water treatment plant. Design horizon is year 2045 with a total population of 100,000 cap.
19,600 m of water transmission main line (Ø550 – Ø200)
2 water reservoirs, 2,000 m3 and 1,000 m3 capacity
1 pumping station, 81 lt/sec capacity
Mechanical, electrical installation works with SCADA systems
Water treatment plant with a capacity of 21,000 m3/day capacity
All related construction works

Design, Construction Supervision and Administrative Support for WSS Systems in Agdash, Goychay and Nakchivan – Urban Water Supply And Sanitation Project (AZERSU Joint Stock Company)
Date: March 2011-April 2017
Location: Azerbaijan
Work Detail: Development of Water Supply and Sanitation Infrastructure of 5 cities, financed by Asian Development Bank (ADB) and Azersu. Component B: Institutional Effectiveness (Management Improvement and Capacity Building). Component C: Program Management Facility (PMF).
Design Population For Year 2034: 87,743 cap.
Water Intake Facility: Infiltration system facilities
Water Transmission Main: L = 15,100 m
Water Reservoirs, Chlorinator and Laboratory Buildings: V=3×2000, 2×2000, 2×10000, 1×5000 m3
Water Network System: 110 mm – 710 mm HDPE pipe L = 462,470 m
Sewerage System: L = 403,952 m
Main Collector: L = 3,451 m HDPE Pipe
Description of actual services provided in the assignment:
The services provided include detailed design of infrastructure system for Agdash, Goychay, and Nakhchivan cities including water intake structures, water transmission lines, water reservoirs, water distribution networks, sewerage systems and collectors and related all details; hydraulic modelling, profiles, washout and air release valves, house connections, in – situ measurement, topographical and geological survey works, bill of quantities, manholes, culvert crossings, tender assistance for procurement documents including contract negotiation and finalization with construction supervision.

Preparation of Detailed Design for Rehabilitation of Water Supply and Sewerage Systems for Oguz, Tovuz, Zagatala and Ağstafa Rayons – Water and Sewerage Project – II (Azerbaijan Agency for Reconstruction Rehabilitation of Areas (ARRA)
Date: August 2010-September 2012
Location: Azerbaijan
Work Detail: The project includes detailed design of infrastructure system for four rayons including water intake structures, water transmission lines, water reservoirs, water distribution networks, sewerage systems and collectors and related all details; hydraulic modelling, profiles, washout and air release valves, house connections, in-situ measurement, topographical and geological survey works, bill of quantities, manholes, culvert crossing, assistance for procurement documents.

Design, Construction Supervision And Administrative Support For WSS Systems in Agdash, Goychay and Nakchivan – Urban Water Supply And Sanitation Project (Azersu)
Date: February 2008-June 2010
Location: Azerbaijan
Work Detail: Supervision of construction works of upgrading and replacement of WSS networks and other facilities (water supply intake, transmission mains, water reservoirs, pumping stations and etc) at Oguz, Tovuz, Zagatala and Aghstafa Rayons.

Suluova Wastewater and Stormwater Project Technical Assistance and Supervision
(Ministry of Environment, Urbanization and Climate Change)
Date: November 2023-Ongoing
Location: Turkey
Work Detail: Consultancy services and technical support for the Suluova wastewater treatment plant with a capacity of Q = 10,098 m3/day, implementation of the loss-leak program, construction supervision of rainwater collectors (L = 26 km) under the management of the European Union – Ministry of Environment, Urbanization and Climate.

Consultancy Services for the Examination of Designs, Preparation of Tender Documents, Support during the Tender Process, and Supervision of Construction Works for the Muş Wastewater Treatment Plant Project. (Muş Municipality (JICA Room Credit)

Date: March 2023-Ongoing
Location: Turkey
Work Detail:The purpose is to review the design of a 24,000 m³/day capacity wastewater treatment plant, prepare tender documents, provide technical support during the tender process, and supervise construction control.

Consultancy Service Procurement for KOSKİ Construction Works and Assembled Goods Procurement Works (KOSKİ General Directorate(JICA Room Credit)
Date: October 2023-On-going
Location: Turkey
Work Detail:

  • This refers to the construction of a main sewer collector line between Sancak Mahallesi and Büsan Chamber
  • Emergency Action Plan Project for Water Loss and Leakage Investigation.Central City Water Network Improvement (Drinking Water Network Improvement and Well Collection Line) Construction Work
  • BYA/BÖA Studies for Water Loss Detection
  • Meter Replacement.
  • SCADA