Planning

Name Of the Work: Preparation of Feasibility Report and Implementation Project of Recovery and Irrigation Transmission Lines for Çiğli Wastewater Treatment Plant
Name Of The Client: IZSU
Start Date: January 2022
Completion Date: October 2022
Location: Turkey
Work Detail:
Design and feasibility study for the reuse of Çiğli Wastewater Treatment Plant discharge water of 220 hm3/year and urban irrigation, agricultural irrigation, and feeding of the Gediz River delta.
The main purpose of the project is to reuse the discharge water of Çiğli WWTP, which has a capacity of 200,000 m3/day, for water saving and effective resource management.

Name Of the Work: Technical support for the development of the Feasibility Study (FS) of the project “Improvement of the Surkhandarya region’s drinking water supply system by using the Tupolang reservoir waters”
Name Of The Client: JSC “Hydroproject”
Start Date: September 2021
Completion Date: December 2022
Location: Uzbekistan
Work Detail:
Providing high-quality drinking water, improving social living conditions, and enhancing the health of the population in Sariasi, Denau, Shurchinsky, Bandykhansky, Kiziriksky, Kumkurgan, Sherabad, Jarkurgan, Angora, Muzrabad, Tezmez districts, and Termez urban centers and rural settlements.
Feasibility study to provide water to the settlements along the existing Tupolangi-Termez water pipeline.
Implementation of a project for a 200,000 m3/day capacity drinking water treatment plant.
Implementation of a 400 km transmission line project.

Name Of the Work: Cesme Sea Water Treatment Plant Feasibility Report
Name Of The Client: IZSU
Start Date: October 2021
Completion Date: On-going
Location: Turkey
Work Detail:
Preparation of Feasibility study of Çeşme desalination plant in order to use sea water as a water supply source.
Main objectives of the Project:
Water supply sustainability,
Utilization of sea water as a water supply source instead of wells,
Lowering the cost of pump stations and the existing system.
Çeşme Desalination Plant WWTP:
1st stage, with horizon 2025 Qdesign = 15,000 m3/day,
2nd stage, with horizon 2055 Qdesign = 35,000 m3/day,
Reverse Osmosis Sea Water Treatment.

Name Of the Work: Feasibility Study and Detailed Design Work of Konya Province Karapınar and Suğla Locations Water Supply
Name Of The Client: Konya Metropolitan Municipality Water and Sewage Administration (KOSKİ)
Start Date: September 2019
Completion Date: December 2020
Location: Turkey
Work Detail:
Design the water supply need of Karapınar and Suğla Locations of Konya province.
Design of infrastructure system includes water transmission lines, water reservoirs, and related all details; hydraulic modeling, profiles, washout, and air release valve.
Design Flow Rate: 261 lt/sn
Design Population: 355,043 cap. With horizon of 2055
Total Length of Water Transmission Line: 159,890 m (Ø600 – Ø90)
Water Storage: 2 x 100 m³, 1 x 200 m³

Name Of the Work: Feasibility Study of Eskişehir (Centrum) Wastewater Treatment Plant
Name Of The Client: İlbank
Start Date: November 2015
Completion Date: April 2016
Location: Turkey
Work Detail:
Preparation of a Feasibility Study for Eskişehir Municipality to identify and identify priority legislative compliance and investment needs for the provision of wastewater services using EIB loans managed by Iller Bank.
Eskişehir WWTP has a design capacity of 146,138.49 m3/day for an equivalent population of 1,344,012.

Name Of the Work: Feasibility Study of Burdur (Centrum) Wastewater Treatment Plant
Name Of The Client: İlbank
Start Date: August 2015
Completion Date: April 2016
Location: Turkey
Work Detail:
Feasibility Study for Burdur to identify and define its priority legislative compliance and investment needs for the provision of wastewater services by using EIB loans administrated by İller Bank.
Main objectives of the Project:
Ensuring that the Burdur City achieves compliance with Turkey’s Urban Wastewater Treatment Regulation 26047, as harmonized with EC Directive 91/271/CEE regarding the collection and treatment of urban wastewaters.
1st stage capacity: 32,820 m3/day, 105,935 PE
2nd stage capacity: 41,448 m3/day, 134,980 PE
Description of actual services provided in the assignment:
Identification of engineering design criteria’s (WWTP effluent discharge, design horizon, population growth projections, WWTP hydraulic & pollution design loads).
Evaluation of WWTP site selection, EIA regulatory requirements & geotechnical study.
Selection of WWTP general process and sludge disposal options.
Preparation of procurement plan.
Preparation of investment and project financing plan.
Evaluation of tariffs and affordability thresholds.
Analysis of total operating costs and revenues.
Analysis of the financial return on investment costs.
Controlling the financial sustainability of the Project.
Credit assessment and evaluation of EIB loan repayment plan.
Risk assessment and mitigation studies.

Name Of the Work: Gaziantep Town Various Accommodation Areas Feasibility Study, Water Supply and Sewage Network Detailed Design Work
Name Of The Client: Gaziantep Metropolitan Municipality (GASKİ)
Start Date: May 2014
Completion Date: May 2016
Location: Turkey
Work Detail:
Within the scope of the work, 139 units between 0-200 persons, 95 units between 201-500 persons, 36 units between 501-1000 persons, 9 units between 1001-2000 persons, 6 units between 2001-5000 persons, 1 unit between 5001-10000 persons capacity potable water and sewerage facilities of 1 settlement were studied and their feasibility was made.
467.87 km of drinking water projects (promotion, transmission, network, etc.), 285.73 km of sewerage projects have been prepared.